Northern Railway Line Resumes Normal Service Sept 27
Train service resumes on Thailand's northern railway line September 27 after flood damage repairs and safety inspections are completed.
The State Railway of Thailand announced that normal train service will resume on the northern railway line from September 27, 2026 at 9:30 AM onward. The recent flooding situation has cleared, and the railway has conducted thorough inspections to restore the route to full operation, ensuring passenger convenience and travel confidence.
Passengers are advised to monitor train information through the Train Tracking System (TTS) to plan their journeys and check travel status independently. Route and service status can be verified at https://ttsview.railway.co.th or by scanning the QR code to access TTS. For additional information, contact the State Railway customer service line at 1690 or visit their social media channels on Facebook, Twitter, and Instagram.